The Project Manager will oversee the project and work with the contractor to insure safety guidelines and local, state and federal regulations are followed, and that the entire project is completed following the scope of work and timeline. Upon completion of the project, the Project Manager will compile all close-out materials and include them in the existing Management Plan.
Asbestos Project Design:
During Asbestos Project Design, Weecycle reviews the Scope of Work which was prepared by the owner or consultant. From the Scope of Work, size of the containment, and information from the Contactor, the Designer determines the layout, functional placement and appropriate numbers for the Negative Air Machines, decontamination unit, shower, direct load out and other applicable design features for the project. The Weecycle project Designer works with input from the Contractor in establishing the design and during follow-up interactions at the site. The Projects Designer is available for questions, discussion of plan changes or challenges during the project.